Utforsk disse og flere idéer!

CSM for Apollo 7 being checked out in the KSC O&C Building on August 5…

CSM for Apollo 7 being checked out in the KSC O&C Building on August 5…

#saturnv #nasa

#saturnv #nasa

The 363-foot tall Apollo Saturn V space vehicle is leaving the Vehicle Assembly Building (VAB) for Pad A, Launch Complex 39, Kennedy Space Center (KSC) Florida. The Saturn V stack and its mobile launch tower are atop a crawler-transporter. The "stack" and the VAB are reflected in the turning basin.

The 363-foot tall Apollo Saturn V space vehicle is leaving the Vehicle Assembly Building (VAB) for Pad A, Launch Complex 39, Kennedy Space Center (KSC) Florida. The Saturn V stack and its mobile launch tower are atop a crawler-transporter. The "stack" and the VAB are reflected in the turning basin.

Workers prepare the S-IVB for mating of the Instrument Unit (pictured left), which houses the guidance, control and other systems of the Saturn V launch vehicle March 21, 1969

Workers prepare the S-IVB for mating of the Instrument Unit (pictured left), which houses the guidance, control and other systems of the Saturn V launch vehicle March 21, 1969

MIR Training Module

An Unparalleled Look Inside the European Space Agency

MIR Training Module

Skylab 2, Apollo/Saturn 1b rocket on Pad 39b, May 9, 1973 | by Dan Beaumont Space Museum

Skylab 2, Apollo/Saturn 1b rocket on Pad 39b, May 9, 1973 | by Dan Beaumont Space Museum

Apollo Lunar space crafts. My uncle led the team that developed the latch that held in the legs of the LM.

Apollo Lunar space crafts. My uncle led the team that developed the latch that held in the legs of the LM.

Apollo 8 #nasa

Apollo 8 #nasa

Mission Control channel on SOMA FM

Mission Control channel on SOMA FM

Space Shuttle Endeavour Travels Through the Streets of Los Angeles to its New Home

Space Shuttle Endeavour Travels Through the Streets of Los Angeles to its New Home

Pinterest
Søk